TEMPORARY WORKS
 
CHELSEA CHELSEA
Major re-development of a semi-detached residence in an exclusive part of South West London...
MORE>>

Pre-Prep School HARTLEY JAM FACTORY
CDS were appointed to design the temporary works to the contiguous bored pile, lined underground car park and provide logistical advice on excavation sequence and methodology...
MORE>>

MONDIAL HOUSE MONDIAL HOUSE
Contractors Design Services were appointed by John F Hunt to design and prepare all of the temporary works schemes...
MORE>>

Pre-Prep School NOTTING HILL
Major re-development of a period family residence in the exclusive Notting Hill area of London...
MORE>>

OVAL ROAD OVAL ROAD
This project is in Camden Town, adjacent to the Regent’s Canal and is a former warehouse dating from the late 1800s. Various facades were required to be retained...
MORE>>

SOUTH KENSINGTON SOUTH KENSINGTON
Major redevelopment of two properties at the end of terrace to form a single residence with an extensive basement under part of the property...
MORE>>

St BRIDE STREET St BRIDE STREET
Temporary façade retention of 4 storey plus basement building on corner of Farringdon Street, St. Bride Street and Fleet Street...
MORE>>

St BRIDE STREET LANSDOWNE CRESCENT
Temporary façade retention of 4 storey plus basement building on corner of Farringdon Street, St. Bride Street and Fleet Street...
MORE>>

St BRIDE STREET WEST LONDON
Construction of a deep basement surrounding an exclusive residential property in West London for a private client...
MORE>>

PERMANENT DESIGNS
 
Pre-Prep School BOLSOVER STREET
104-108 Bolsover Street is a 7 storey structure including ground floor plus basement built circa 1965...
MORE>>

Pre-Prep School GLADBECK WAY
Gladbeck Way, Enfield - a block of 18 apartments on four levels with, the fourth being a mezzanine level within the roof space...
MORE>>

Pre-Prep School GROVER CLOSE
The development at Grover Close consists of four blocks of three and four storey social housing apartments for High Town Praetorian Housing Association...
MORE>>

Pre-Prep School GULLET WOOD
Disused and derelict local authority garages previously occupied the brown field site at Gullet Wood, Watford...
MORE>>

Pre-Prep School OXFORD CASTLE
Archaeological investigations indicate the site of Oxford Castle, latterly Oxford Prison, has been occupied since the time of the Norman Conquest...
MORE>>

Pre-Prep School PRE-PREP SCHOOL
Due to expansion, Bishops Stortford College needed to enlarge the capacity of their pre-prep facilities...
MORE>>

Pre-Prep School St. PANCRAS CHAMBERS
The Grade 1 listed St Pancras Chambers, formerly the 300 bedroom Midland Grand Hotel, was designed by Sir George Gilbert Scott and completed in 1876...
MORE>>

 