CDS - Case Study - Oval RoadOval Road
Camden Town, London NW4

This project is in Camden Town, adjacent to the Regent’s Canal and is a former warehouse dating from the late 1800s. Various facades were required to be retained; some of these facades needed vertical as well as lateral support due to the removal of existing cast iron columns.

Five different temporary works retention systems were required, some of which are linked, to offer mutual support. Others required kentledge to achieve stability. Contractors Design Services were appointed by Squibb Demolition Ltd to design the temporary works, provide day to day advice on the inevitable design modifications as they arose and supervise handovers and inspections. In total, over 100 tonnes of structural steelwork was installed.

CDS - Case Study - Oval Road CDS - Case Study - Oval Road

Contractors Design Services also advised on the underpinning and excavation of the large masonry piers and removal of the arches in gutted ground floor areas. Out-of-balance horizontal thrusts caused by removal of sections of the arched ground floor required the design and installation of lateral restraint bracing before these could be demolished.

CDS - Case Study - Oval Road

 

CDS
CDS
Contractors Design Services Ltd, Unit 74, The Maltings, Roydon Road, Stanstead Abbotts, Ware, Herts, SG12 8HG UK
Tel: 01920 877077  :  Fax: 01920 870011  :  Email: enquiries@contractorsdesign.co.uk